Plant Operating Standard
ED-52 Electrical Distribution
A. Normal Operation, Reactor at Power
A. Normal Operation, Reactor Startup
ALL ED System conditions the same as for Reactor at power except:
- 1. Both ADG's operating until sufficient power can be supplied by TG's.
Minimum Condition for Reactor Operation
My text copyright 2020 Tommy Johnson, all rights reserved. I believe the Savannah documentation is property of
MARAD or the US government.