Equipment Failure Procedure

ED-52 Electrical Distribution System 10/22/62

A. One TG is Inoperative

B. An ABT for Group Control A1, A2, C1, or C2 Becomes Inoperative to Transfer Automatically

C. An ABT for Group Control D1 or D2 Becomes Inoperative To Transfer Automatically

D. One DC/AC MG Set Shutdown

E. One AC/DC MG Set Inoperative

F. Battery Less Than Fully Charged

G. One ADG Inoperative With Both TG's Running

H. Besler Boiler Operation

I. Ground on Any Reactor Circuit


My text copyright 2020 Tommy Johnson, all rights reserved. I believe the Savannah documentation is property of MARAD or the US government.