Equipment Failure Procedure

DK-48 Emergency Cooling System 10/22/62

A. Failure Of The Emergency Cooling System Or Its Related Equipment

NOTE: The emergency cooling system is to be operated weekly to ensure that all DK equipment is satisfactory. Should any portion of the emergency cooling not operate satisfactorily, the reactor is to be shutdown and repairs made to the faulty equipment. The primary system requires cooling and depressurizing only for repairs on certain pieces of equipment.


My text copyright 2020 Tommy Johnson, all rights reserved. I believe the Savannah documentation is property of MARAD or the US government.