Standard Operating Procedure 1104 Procedure for Reactor Startup Revision 2 4/12/1965

Procedure for Reactor Startup

Procedure for Reactor Startup

Approximately uniform reactivity increments of either <=8 cents or <= 16 cents for startup rod withdrawal are defined by the sequence of rod positions below.


Group A		Group E		Group D		Group C, B
8c	16c	8c	16c	8c	16c	8c	16c

0.0	*	0.0	*	0.0	*	0.0	*
2.5		2.0		4.0		2.0
5.0	*	4.0	*	6.0	*	4.0	*
6.0		5.5		7.5		5.5
7.0	*	7.0	*	9.0	*	7.0	*
8.0		8.0		10.0		8.0
9.0	*	9.0	*	11.0	*	9.0	*
9.5		1"	2"	1"	2"	9.5
10.0	*	pulls	pulls	pulls	pulls	10.0	*
1/2"	1"	 |	 |	 |	 |	1/2"	1"
pulls	pulls	 |	 |	 |	 |	pulls	pulls
 |	 |	 |	 |	 |	 |	 |	 |
 |	 |	 |	 |	 |	 |	 |	 |
 |	 |	\|/	\|/	\|/	\|/	\|/	\|/
 |	 |	27.0	*	30.0	*	34.0	*
 |	 |	28.5		31.5		35.5
\|/	\|/	30.0	*	33.0	*	37.0	*
To Base		31.5		34.5		38.5
Load		33.0	*	36.0	*	40.0	*
Position	35.0		38.0		43.0	
		37.0	*	40.0	*	46.0	*
		40.0		42.0		50.0
		43.0	*	45.0	*	58.0	*
		48.0		50.0
		58.0	*	58.0	*